| Important to note: all
data listed below should purely serve as "quick reference"
only |
 |
| All information was collected from www.visitlondon.com
& www.london2012.com |
| for the latest and most complete information
we suggest you to visit the above pages |
| meanwhile, we hope these few pages may
satisfy your general interest: |
| |
| Accommodation
for visitors |
| |
|
| Hotels |
|
| 50.000 rooms in 260 hotels
are already preallocated to the Governamentally controlled
body that shall monitor fair pricing during the period
from 27th July till 12th of August 2012. That is more
than 65 % of all available hotel rooms in London. The
remaining rooms are being sold by hotels and or agent
such as ourselves, possibly with a similar pricing structure
(decided by hotels). |
|
|
|
Houses & Apartment rentals
during the games
* Local estate agents are stocked with new material (we
can try to support with this)
* Alternatives available to see at www.hotelslondonolympicgames.co.uk
|
|
| |
|
Other useful links
supporting you with information on accommodation:
*www.london2012.com/visiting/accommodation/index.php
*www.visitlondon.com/2012/essential-information/london-
2012-accommodation
|
|
| |
|
| |
|
| Accommodation
for the atheletes |
|
| |
|
Olympic Village
* 65 blocks with 2818 apartments
During the Games the Olympic Village will comprise residential
apartments for around 17,000 athletes and officials, along
with shops, restaurants, medical, media and leisure facilities
and large areas of open space.
The Village will also include a 'Village Plaza’
where athletes can meet with friends and family. The plan
retains London's tradition of building homes around communal
squares and courtyards, with water features accentuating
the closeness of the River Lea.
Athletes will have an inspirational view over the Park.
Every apartment will provide comfortable accommodation
and state-of-the-art communications facilities, including
internet access and wireless networking. All the apartment
blocks will be fully accessible and equipped with modern
lifts.
During the Games the Village will include ‘back
of house’ operations, and services for athletes
such as catering and transport. The majority of these
will be accommodated in temporary structures on sites
that can be cleared for development immediately after
the Games.
|
|